Post Offer Free
CNBM international corporation group  

Gold Index: 3654

You are here: home  > Bridge Formwork  > GTF System with High Construction Efficiency for Bridge Deck Construction

GTF System with High Construction Efficiency for Bridge Deck Construction 

Place of Origin: Beijing, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: GTF system


bridge deck formwork
<s


bridge deck formwork

mivan aluminium formwork

permanent formwork systems



GTF System with High Construction Efficiency for Bridge Deck Construction


Description:

1. Brief introduction

GTF system is a kind of compositional formwork system, it is especially for the bridge floor construction. GTF is composed of two sub system: formwork system and traveling machine.




2. Competitive advantage

.High construction efficiency

The formwork system is easily to assembling, in the procedure of construction, crane is not depended. The movement of formwork is achieved by traveling machine.

. Good safety performance

The formwork system is not needed to dismantle and move by auxiliary tool or machine, and there are all-around operation platforms, all this makes GTF system in good safety performance.

 

3. Applications



 

bigPhoto
 Mr. Louis Liu
Sales
Tel: 86-10-68796333
Fax: 86-10-68796677
Mobile: 86- 134 2622 6873
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

CNBM international corporation group [China (Mainland)]


Business Type:Manufacturer
City: Beijing
Province/State: Beijing
Country/Region: China (Mainland)

You May Like: