CNBM international corporation group
|
Place of Origin: | Beijing, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
bridge deck formwork
mivan aluminium formwork
permanent formwork systems
High Construction Bridge Formwork For Bridge Deck Construction
Description:
1. Brief introduction
GTF system is a kind of compositional formwork system, it is especially for the bridge deck construction. GTF is composed of two sub system: formwork system and traveling machine.
2. Competitive advantage
.High construction efficiency
The formwork system is easily to assembling, in the procedure of construction, crane is not depended. The movement of formwork is achieved by traveling machine.
. Good safety performance
The formwork system is not needed to dismantle and move by auxiliary tool or machine, and there are all-around operation platforms, all this makes GTF system in good safety performance.
3. Applications