CNBM international corporation group
|
Place of Origin: | Beijing, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
self climbing formwork system
self climbing formwork
climbing formwork system
Auto - Climbing Formwork System For Building and Bridges ACS100
Description:
Auto-climbing system ACS100 is composed of formwork system, bracket system, hydraulic system, anchor system. It guarantees simple procedure of assembly and climbing without any lifting machine, so it is the best choice for the high rise building and bridges.
Competitive Advantage:
1. Perfect anchor system with high load bearing capacity.
As the picture shown, the anchor system is composed of five parts. The load bearing will firstly be transferred to tensile bolt, then be transferred to climbing cone, tensile tie and anchor plate, that means the concrete structure will be the final force point. Therefore, the whole ACS system unit is very safe and stable.
2. Crane-independent
Crane-independent forming, striking and climbing speeds up the work procedures on the construction site and also makes them independent of each other. This means the planned sequences can be maintained along with guaranteeing high productivity levels. The crane can therefore be used for other tasks.
3. High bearing capacity and safe
The stable working platforms are able to carry large loads, e.g. the storage of reinforcing steel for the next climbing section. Generously-sized working platforms, the well thought-out design for handling very high wind loads and the patented control function of the climbing mechanism are some of the special details contained within the comprehensive safety concept.
4. Platforms adjusted to suit the angle of inclination
The horizontal working areas thus created provide safe and comfortable conditions for reinforcement work, shuttering and striking, concreting and finishing.
5. Outstanding economical efficiency
The ACF system climbing without any lifting machine and it guarantees the simple operation procedure. Time saving, labor saving, site saving, so economical construction is easily achieved.